Brix ERP

Shop Floor Control

Real-time monitoring of all production work centers.

Overall Equipment Effectiveness (OEE)

Comparison of OEE and its components across major work centers.

CNC Machining Center

Running
Current WO: WO-SUB-A1-00175%

OEE

88%

95%

Avail.

98%

Perf.

95%

Qual.

Final Assembly Line 1

Running
Current WO: WO-FG-A-05040%

OEE

92%

98%

Avail.

96%

Perf.

98%

Qual.

Painting Booth

Idle
Current WO: N/A0%

OEE

0%

100%

Avail.

0%

Perf.

0%

Qual.

Final Assembly Line 2

Downtime
Current WO: WO-FG-B-02115%

OEE

35%

40%

Avail.

99%

Perf.

88%

Qual.